水道港口2011,Vol.32Issue(6):423-426,4.
依兰航电枢纽过鱼设施水流条件研究
Study on flow condition in fish-pass structures of Yilan navigation and hydropower proiect
于广年 1王义安1
作者信息
- 1. 交通运输部天津水运工程科学研究所工程泥沙交通行业重点实验室,天津300456
- 折叠
摘要
Abstract
The vertical-slot fishway and the natural imitated fishway were studied through hydraulics experiment by using the normal integral model with the scale of l:20.The variation of hydraulic factors such as water level, gradient ratio and flow rate in the fishway with different flow conditions were mainly studied.Then the primary and secondary structure,length,bottom slope,slit width and pool room -number of the fishway were optimized.The fishway optimization scheme for Yilan navigation-power junction project was proposed through comprehensive comparison of fishway general layout,pool room structure,discharge volume,water level,gradient ratio changes,flow velocity variation,fishway construction,operation and maintenance.关键词
鱼道/物理模型/竖缝式鱼道/仿自然通道鱼道Key words
fishway/ physical model/ vertical-slot fishway/ natural imitated fishway分类
建筑与水利引用本文复制引用
于广年,王义安..依兰航电枢纽过鱼设施水流条件研究[J].水道港口,2011,32(6):423-426,4.