| 注册
首页|期刊导航|水道港口|海上风电场风机桩基局部冲刷计算

海上风电场风机桩基局部冲刷计算

王卫远 杨娟 李睿元

水道港口2012,Vol.33Issue(1):57-60,4.
水道港口2012,Vol.33Issue(1):57-60,4.

海上风电场风机桩基局部冲刷计算

Calculation of local scour around wind turbine's pile of offshore wind farm

王卫远 1杨娟 1李睿元1

作者信息

  • 1. 中国水电顾问集团华东勘测设计研究院,杭州310014
  • 折叠

摘要

Abstract

When building the offshore wind farm, the marine environment of wind turbine is very complex. Scour hole around wind turbine's pile will form because of the influence of meteorology arid hydrology factors, such as wind,wave,current,and so on.It will affect the stability of wind turbine.Therefore,the local scour depth of wind turbine is an important parameter for engineering design. Based on the field observation data of the piles in Chengdao oil field,two commonly used empirical formulas (HAN Hai-qian and WANG Ru-kai) were verified.The synthesis speed of wave and current was used to replace the pure tidal current speed.The results show that the role of wave on sand can not be ignored in this area.The re-calculated result by HAN Hai-qian formula is in good agreement with measured result,and the results have some reference value to the actual project.

关键词

海上风电场/局部冲刷/经验公式

Key words

offshore wind farm/local scour/empirical formula

分类

建筑与水利

引用本文复制引用

王卫远,杨娟,李睿元..海上风电场风机桩基局部冲刷计算[J].水道港口,2012,33(1):57-60,4.

基金项目

华东院科技项目(KY2009-02-06) (KY2009-02-06)

水道港口

OACSTPCD

1005-8443

访问量0
|
下载量0
段落导航相关论文