| 注册
首页|期刊导航|水利水电技术|PCCP输水工程设计应用常见问题研究

PCCP输水工程设计应用常见问题研究

孟晋忠 卢改林

水利水电技术2012,Vol.43Issue(3):23-25,3.
水利水电技术2012,Vol.43Issue(3):23-25,3.

PCCP输水工程设计应用常见问题研究

Study on common problems in design of PCCP water conveyance project

孟晋忠 1卢改林2

作者信息

  • 1. 水利部山西水利水电勘测设计研究院,山西太原030024
  • 2. 山西大学工程学院,山西太原030013
  • 折叠

摘要

Abstract

In accordance with the engineering practice of the design of water conveyance project constructed with pre-stressed concrete cylinder pipe (PCCP) , some problems from the design and application of PCCP are studied herein, such as rationality of the standards adopted; correct selection of the design load for the pipe; selection of the pressure for the test of the pipe joint; the optimization of the strength, thickness and wrapping area of the pipe core concrete, etc. , so as to promote the reasonable selection of the design parameters, ensure the safety and reliability of the construction and then save the project investment concerned. Furthermore, some relevant suggestions are put forward for providing some references for the similar project as well.

关键词

预应力钢筒混凝土管(PCCP)/设计/应用

Key words

pre-stressed concrete cylinder pipe (PCCP) / design/ application

分类

建筑与水利

引用本文复制引用

孟晋忠,卢改林..PCCP输水工程设计应用常见问题研究[J].水利水电技术,2012,43(3):23-25,3.

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量3
|
下载量0
段落导航相关论文