PCCP输水工程设计应用常见问题研究
Study on common problems in design of PCCP water conveyance project
孟晋忠 1卢改林2
作者信息
- 1. 水利部山西水利水电勘测设计研究院,山西太原030024
- 2. 山西大学工程学院,山西太原030013
- 折叠
摘要
Abstract
In accordance with the engineering practice of the design of water conveyance project constructed with pre-stressed concrete cylinder pipe (PCCP) , some problems from the design and application of PCCP are studied herein, such as rationality of the standards adopted; correct selection of the design load for the pipe; selection of the pressure for the test of the pipe joint; the optimization of the strength, thickness and wrapping area of the pipe core concrete, etc. , so as to promote the reasonable selection of the design parameters, ensure the safety and reliability of the construction and then save the project investment concerned. Furthermore, some relevant suggestions are put forward for providing some references for the similar project as well.关键词
预应力钢筒混凝土管(PCCP)/设计/应用Key words
pre-stressed concrete cylinder pipe (PCCP) / design/ application分类
建筑与水利引用本文复制引用
孟晋忠,卢改林..PCCP输水工程设计应用常见问题研究[J].水利水电技术,2012,43(3):23-25,3.