北疆某水电站尾水管安装工艺
Installation technology for draft tube of a hydropower station in North Xinjiang
罗清萍 1虢强2
作者信息
- 1. 新疆额尔齐斯河流域开发工程建设管理局,新疆乌鲁木齐830000
- 2. 新疆电力设计院,新疆乌鲁木齐830002
- 折叠
摘要
Abstract
The in situ assembly of draft tube diffuser, draft tube installation and the relevant deformation resistance welding for the construction of a hydropower station in the North Xinjiang are described herein. Moreover, the problem from settlement during the installation of draft tube is analyzed as well. Through the installation of the draft tube, a set of construction methods and experiences of the draft tube and its diffuser installations on ground is summarized, which accumulates some valuable experiences for the similar construction in the days to come.关键词
水电站/尾水管/扩散段/北疆Key words
hydropower station/ draft tube/ diffuser/ North Xinjiang分类