中国工程科学Issue(2):45-48,4.
超深立井安全高效施工信息化监测监控
Monitor and control of ultra-deep shaft safety and efficient construction
沈慰安 1梁恒昌 2赵光思2
作者信息
- 1. 中煤第五建设有限公司,江苏徐州221000
- 2. 中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州221008
- 折叠
摘要
Abstract
With the increase of the depth of shaft construction, shaft wall safety and the construction are becoming difficult. To ensure the safety and shaft wall construction safety and other factors, the real-time control and monitoring of the construction process is necessary. Feedback monitoring is an important method to ensure the construction safety. Base on the background of Benxi Dataigou Iron Mine' s ultra-deep shaft with diameter of 6.5 m, depth of 1 640 m, the paper proposed methods to monitor the shaft wall safety and the condition of construction. It introduced the information construction for video monitor system, hanging plate important point monitor system and promoting bucket monitor system. The monitor system implementation plan may provide detailed information for ultra-deep shaft efficient construction.关键词
超深立井/安全/信息化施工/监测监控Key words
ultra-deep shaft/ safety/ information construction/ monitor and control分类
矿业与冶金引用本文复制引用
沈慰安,梁恒昌,赵光思..超深立井安全高效施工信息化监测监控[J].中国工程科学,2012,(2):45-48,4.