| 注册
首页|期刊导航|中国空间科学技术|考虑人及组织因素的航天工程项目风险分析模型

考虑人及组织因素的航天工程项目风险分析模型

孟华 麦强 安实

中国空间科学技术2012,Vol.32Issue(1):60-65,76,7.
中国空间科学技术2012,Vol.32Issue(1):60-65,76,7.DOI:10.3780/j.issn.1000-758X.2012.01.009

考虑人及组织因素的航天工程项目风险分析模型

Risk Analysis Model of Aerospace Engineering Project Incorporating Human and Organization Factors

孟华 1麦强 1安实1

作者信息

  • 1. 哈尔滨工业大学管理学院,哈尔滨150001
  • 折叠

摘要

Abstract

The mechanism of project risk caused by human and organization factors was revealed, and a model of risk analysis for aerospace engineering project incorporating the human and organization factors based on the mechanism was proposed. Based on the model, the quality of spacecraft component manufacturing considering the human and organization factors was evaluated, and then the consistency probability between the operational task quality and the different types of defect was assessed, and the defect severity was calculated according to Poisson distribution. Finally, the prior default rate of component was updated based on Bayesian theorem. The model framework was validated by an aerospace engineering project with modified data.

关键词

风险分析/人及组织因素/贝叶斯定理/航天工程项目

Key words

Risk analysis/Human and organization factors/Bayesian theorem Aerospace engineering project

引用本文复制引用

孟华,麦强,安实..考虑人及组织因素的航天工程项目风险分析模型[J].中国空间科学技术,2012,32(1):60-65,76,7.

基金项目

国家自然科学基金(70903017),高等学校博士点基金(20092302120012),黑龙江省自然科学基金(QC2010087)资助项目 (70903017)

中国空间科学技术

OA北大核心CSCDCSTPCD

1000-758X

访问量0
|
下载量0
段落导航相关论文