北京测绘Issue(1):81-83,3.
侯庄矿区-340米水平斜井延伸贯通测量
The Inclined Shaft Extending Run- through Measurement Summary of Houzhuang Mine in -340m Level
赵大江1
作者信息
- 1. 山东金岭铁矿侯庄分矿,山东淄博255000
- 折叠
摘要
Abstract
This article introduces an example of inclined shaft extending run-through from the measurement and comparison with the measured deviations to the error prediction to discuss relevant issues with colleagues.关键词
斜井延伸/贯通/误差预计/实测偏差Key words
inclined shaft extending/run-through/error prediction/measured deviations分类
天文与地球科学引用本文复制引用
赵大江..侯庄矿区-340米水平斜井延伸贯通测量[J].北京测绘,2012,(1):81-83,3.