长春工程学院学报:自然科学版2012,Vol.13Issue(1):16-19,4.
SX56m/2200t型上行式移动支架造桥机节段拼装56m简支箱梁施工技术
The segment assembling construction technology of simply supported box girder of 56m span by SX56m/2200t upward moving trestle bridge fabrication machine
成思1
作者信息
- 1. 中铁十三局集团第二工程有限公司,深圳518083
- 折叠
摘要
Abstract
Combining with the segment assembling instance of 12-hole single-box and double-line prestressing concrete of 56m span simple-supported box girder in newly built Datonghe Extra-large bridge in Lanzhou,the paper introduces the general structure and key technology of simply supported box girder of 56m span by SX56m/2200t upward moving trestle bridge fabrication machine.关键词
上行式移动支架造桥机/节段拼装/施工技术Key words
upward moving trestle bridge fabrication machine/segmental assembled/construction technology分类
交通运输引用本文复制引用
成思..SX56m/2200t型上行式移动支架造桥机节段拼装56m简支箱梁施工技术[J].长春工程学院学报:自然科学版,2012,13(1):16-19,4.