| 注册
首页|期刊导航|长江科学院院报|某土石坝帷幕灌浆渗流监测成果分析

某土石坝帷幕灌浆渗流监测成果分析

李刚 李军 杨开华

长江科学院院报2012,Vol.29Issue(5):86-89,4.
长江科学院院报2012,Vol.29Issue(5):86-89,4.

某土石坝帷幕灌浆渗流监测成果分析

Analysis of Seepage Monitoring Data for an Earth-rock Dam after Curtain Grouting

李刚 1李军 2杨开华3

作者信息

  • 1. 长江科学院工程安全与灾害防治研究所,武汉430010
  • 2. 长江科学院水利部水工程安全与病害防治工程技术研究中心,武汉430010
  • 3. 长江科学院国家大坝安全工程技术研究中心,武汉430010
  • 折叠

摘要

Abstract

This research is to understand the effect of curtain grouting for earth-rock dam and the regularity of seepage pressure variation after reinforcement. We analyzed the monitoring data of a clay-core earth-rock dam by means of stepwise regression and finite elements method. The stepwise regression analysis indicated that the main factors which affect the seepage field are reservoir water level, rainfall and ageing. The influence of reservoir water level on seepage decreased toward downstream gradually while the influence of rainfall and ageing increased. According to computation through finite elements method, partial curtain can reduce seepage by 10.7% , whereas fully closed curtain can reduce seepage by 37.6% . Full curtain grouting performs better in seepage control.

关键词

渗流监测/土石坝/逐步回归/有限元/帷幕灌浆

Key words

seepage monitoring/ earth-rock dam/ stepwise regression/ finite element/ curtain grouting

分类

建筑与水利

引用本文复制引用

李刚,李军,杨开华..某土石坝帷幕灌浆渗流监测成果分析[J].长江科学院院报,2012,29(5):86-89,4.

基金项目

水利部公益性行业科研专项(200901058) (200901058)

国家科技支撑计划课题(2012BAK10B04) (2012BAK10B04)

长江科学院院报

OA北大核心CSCDCSTPCD

1001-5485

访问量0
|
下载量0
段落导航相关论文