| 注册
首页|期刊导航|电焊机|成品油长输管道冬季焊接防护措施

成品油长输管道冬季焊接防护措施

刘辉 周翠 李志飞

电焊机2012,Vol.42Issue(4):90-92,3.
电焊机2012,Vol.42Issue(4):90-92,3.

成品油长输管道冬季焊接防护措施

Protective measures of welding in winter of long-distance refined oil pipeline

刘辉 1周翠 2李志飞1

作者信息

  • 1. CPE新疆石油工程建设有限责任公司 压力容器厂,新疆克拉玛依834000
  • 2. 西南石油大学,四川成都610500
  • 折叠

摘要

Abstract

Along the pipeline engineering of refined oil transportation produced by Ningxia Petrochemical Corporation,there are many cultivated lands,in order to reduce the cost,the pipeline engineering should be constructed in winter when the temperature is low and there are no cash crops.Welding in winter construction mainly takes measures such as preheating,windbreak shelter,keeping interpass temperature and post welding heat treatment, flap closure and so on, to ensure the welding quality .When the measures accounted above are used in the welding of L245 pipeline steel,the radiographic inspection test and mechanical properties of weld joint one-time qualified quality reaches 99.64%,which can satisfy the quality standards.Moreover,after the quality assurance measures are taken in the winter construction, the quality of the weld has been improved, the cost has been reduced and following great economic and social benefits.

关键词

长输管道/冬季焊接/防护措施

Key words

long-distance oil and gas pipeline/ welding in winter precaution measures

分类

矿业与冶金

引用本文复制引用

刘辉,周翠,李志飞..成品油长输管道冬季焊接防护措施[J].电焊机,2012,42(4):90-92,3.

电焊机

OA北大核心CSTPCD

1001-2303

访问量0
|
下载量0
段落导航相关论文