煤矿安全2012,Vol.43Issue(3):168-171,4.
厚硬顶板综放工作面初采期间支架适用性分析
Analysis on Support Adaptability of Fully - mechanized Caving Working Face with Thick - hard Roof in Initial Mining Stage
周艳青 1陈庆峰 1荆、川 1何利辉1
作者信息
- 1. 中国矿业大学矿业工程学院,江苏徐州221008
- 折叠
摘要
Abstract
The support whether it adapted to the conditions of coal and roof or not, as critical equipment of fully mechanized caving method, has a direct impact to caving efficiency level, so it is necessary to determine its adaptability. Working condition of the support was phased as a result of overburden structure changed in initial stage. Stress analysis of the selected support concluded that the corre- sponding effective measures should be applied to different working condition of the support. Pressure measuring stations were installed at the working face to monitor supporting resistance. The analysis results of all support working condition in initial stage showed that stability and stress state of support was good, and the top coal caving was better, which generally met production requirements.关键词
厚硬顶板/综放面/液压支架/适用性Key words
thick- hard roof/fully mechanized caving face/hydraulic support/applicability分类
矿业与冶金引用本文复制引用
周艳青,陈庆峰,荆、川,何利辉..厚硬顶板综放工作面初采期间支架适用性分析[J].煤矿安全,2012,43(3):168-171,4.