摘要

Abstract

Using Mohr-Coulomb plasticity constitutive model,Isotropic-Fluid-Flow constitutive model and Fluid-Mechanical Interaction seepage calculation mode,the FLAC3D numerical model of seepage calculation of solid-fluid coupling was established,and the "excavation-support-re-excavation" simulation process was used.Through the simulation analysis on the deformation and failure mechanism of the track roadway at the depth of 600 m of 38th panel in Shizuishan No.1 coal mine,the key parts of deformation and failure in deep roadway were concluded,which provided a new theoretical basis for deep tunnel support.

关键词

深部软岩/剪切破坏/固流耦合/数值模拟

Key words

deep soft rock/shear failure/solid-fluid coupling/numerical simulation