Aiming at the problems of the exist information exchange few,response speed slow,transmission signal distortion and lost for the integrated automatization system in Hongsibao 110 kV Substation,based on the 35 kV-110 kV Unattended Substation Design Regulation,makes whole reconstruction for it,after the improvement,the integrated automatization system using advanced delamination and distributed structure with is the distribution in combination with centralization.The schemes implemented results show that the system capacity and signal transmission quality of substation obviously intensify,and automatization level reaches the technology demand of unattended substation.关键词
110kV变电站/综合自动化系统/无人值班变电站Key words
110 kV substation/integrated automatization system/unattended substation分类