宁夏电力调度大楼新风机组改造

秦志辉

宁夏电力Issue(1):61-65,5.
宁夏电力Issue(1):61-65,5.

宁夏电力调度大楼新风机组改造

Reconstruction of the new air fan unit in Ningxia Electric Power Dispatching Building

秦志辉1

作者信息

  • 1. 宁夏天净物业服务有限公司,宁夏银川750001
  • 折叠

摘要

Abstract

Aiming at the problems of the sprinkler nozzles of fire protection water pipes often freeze at the top of second floor in Ningxia Electric Power Dispatching building,by the calculating analysis and reasoning,decides to reconstruct the air fan unit and increase the heat air cycle system.The result of reconstruction shows that the air fan unit has formed the heat air cycle system at the top of second floor,achieves demand of the temperature,insures safe operation of fire protection equipment,acquires well societal and economic benefit.

关键词

中央空调/新风机组/温度

Key words

center air condition/air fan unit/temperature