电站取水口复杂冲沙廊道系统运行方式优化的试验研究——以大渡河龙头石水电站为例
Experimental Investigation on Operation Scheme Optimization of Complex Sand-flushing System of Intake
摘要
Abstract
Complex sand-flushing system results in the disproportion of discharge through each outlet and the disparity of each funnel range.Simultaneously,hydraulic characteristics in connection part between sand-discharging outlet and the gallery is very complicated.Therefore,it is very difficult to achieve wide funnel range and good pressure characteristic by the simple operation schemes while keeping the form of sand-flushing structure.Based on hydraulic model test of sand-flushing system in the intakes of Longtoushi hydropower station in Dadu River,operation schemes were studied by physical models.The results revealed that the funnel range can be wide and pressure characteristic be good by means of changing operation scheme of the sand flushing system,which has important engineering and economic impacts for designing operation scheme of similar sand-flushing system of water intake.关键词
水力学/复杂冲沙廊道/排沙漏斗/动床试验/运行方式/压力Key words
hydraulics/complex sand-flushing/scour funnel/movable-bed model/operation scheme/pressure分类
建筑与水利引用本文复制引用
刘达,李连侠,黄本胜,廖华胜,张延忠..电站取水口复杂冲沙廊道系统运行方式优化的试验研究——以大渡河龙头石水电站为例[J].四川大学学报:工程科学版,2012,44(2):16-20,5.基金项目
国家自然科学基金资助项目 ()
教育部博士点新教师基金资助项目 ()