新运营环境下三峡梯级联合调度系统方案设计

李清清 周建中 许继军 董玲燕

水力发电2012,Vol.38Issue(2):61-64,4.
水力发电2012,Vol.38Issue(2):61-64,4.

新运营环境下三峡梯级联合调度系统方案设计

Scheme System Design for the Joint Operation of Three Gorges Cascade Hydropower Plants under New Operation Environment

李清清 1周建中 2许继军 1董玲燕1

作者信息

  • 1. 长江水利委员会长江科学院,湖北武汉430010
  • 2. 华中科技大学水电与数字化工程学院,湖北武汉430074
  • 折叠

摘要

Abstract

Under new operation environment, the joint operation of three gorges cascade hydropower plants need new scheme system. The main problems in scheme system design are analyzed and the functional structure is designed. The main modules of system such as information management, forecasting and joint operation scheduling are properly set up, and at the same time, the programming method and the database structure are also put forward based on object-oriented concept for solving the problems. The integration scheme of the system is proposed.

关键词

三峡-葛洲坝梯级/联合优化调度/功能结构/面向对象/集成方案

Key words

Three Gorges -Gezhouba cascade hydropower plant/ joint optimal operation/ functional structure/ object -oriented/ integration scheme

分类

建筑与水利

引用本文复制引用

李清清,周建中,许继军,董玲燕..新运营环境下三峡梯级联合调度系统方案设计[J].水力发电,2012,38(2):61-64,4.

基金项目

科技部项目(KJB0909/ZY02) (KJB0909/ZY02)

长江科学院基本科研业务费项目(CKSF2010001) (CKSF2010001)

国家重点基础研究发展计划(973计划)项目(2007CB714106) (973计划)

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文