摘要

Abstract

According to topographic and geologic conditions, the dam type, the general layout program, and the input elevation, scale and energy dissipation type of flood discharge structure are selected for the construction of Kushitayi Hydropower Station. The main design features of the project are also introduced herein.

关键词

坝型/枢纽布置/消能形式/库什塔依水电站

Key words

dam type/ project layout/ energy dissipation type/ Kushitayi Hydropower Station