蒲石河抽水蓄能电站初期蓄水及调度运行研究OA北大核心CSTPCD
Study on Preliminary Water Impoundment and Operation Scheduling of Pushihe Pumped-storage Power Station
蒲石河抽水蓄能电站初期蓄水既要满足下游综合用水要求,又要确保电站首台机组投产发电.为此,结合施工度汛等要求,论证蓄水时机、分析下游用水要求、制定蓄水原则,提出水库初期蓄水方案和调度运行方式,为电站早日在电网中发挥作用提供保障.
The preliminary water impoundment of Pushihe Pumpcd-storage Power Station not only meets the requirements of lower reach water consumption, but also guarantees the first unit to put into operation on time. To this end, taking account of the requirements for constructing in flood season, the time of water impoundment is demonstrated, the requirements on water consumption of downstream areas are analyzed, the principles of water impoundment is formulated, and …查看全部>>
赵忠文;王相波;李晓军;张彦东;郭世安;陈立秋
辽宁蒲石河抽水蓄能有限公司,辽宁 丹东118216中水东北勘测设计研究有限责任公司,吉林 长春130021中水东北勘测设计研究有限责任公司,吉林 长春130021中水东北勘测设计研究有限责任公司,吉林 长春130021中水东北勘测设计研究有限责任公司,吉林 长春130021中水东北勘测设计研究有限责任公司,吉林 长春130021
建筑与水利
初期蓄水调度运行蒲石河抽水蓄能电站
preliminary water impoundment operation scheduling Pushihe Pumped-storage Power Station
《水力发电》 2012 (5)
4-6,3