水力发电2012,Vol.38Issue(5):28-30,71,4.
蒲石河抽水蓄能电站上库分水岭渗漏分析
Seepage Analysis of Watershed Divide for the Upper Reservoir of Pushihe Pumped-storage Power Station
杨宗玲 1田作印 1郑以宝 1张建辉 1吕君卓1
作者信息
- 1. 中水东北勘测设计研究有限责任公司,吉林 长春130021
- 折叠
摘要
Abstract
The upper reservoir of Pushihe Pumped-storage Power Station is a natural reservoir basin. The reservoir seepage is one of key engineering geological problems. The seepage of the watershed divide around upper reservoir with a total length of 3 700.2 m is analyzed, and the results show that the seepage of north reservoir bank with a length of 846 m is unlikely to occur after water storage, the seepage of west and south banks will increase because the hydraulic gradient is increased and the seepage path is shorten, there may be seepage passages in west bank because there are F]t F,j and Fm faults, and the total seepage of upper reservoir is 3 413.89 m'/d. The above analysis can basically reflect the actual seepage, but some issues need to be further studied.关键词
渗漏/上库/分水岭/蒲石河抽水蓄能电站Key words
seepage/ upper reservoir/ watershed divide/ Pushihe Pumped-storage Power Station分类
建筑与水利引用本文复制引用
杨宗玲,田作印,郑以宝,张建辉,吕君卓..蒲石河抽水蓄能电站上库分水岭渗漏分析[J].水力发电,2012,38(5):28-30,71,4.