| 注册
首页|期刊导航|森林工程|基于DEA的建设项目集成管理信息系统运行效率评价

基于DEA的建设项目集成管理信息系统运行效率评价

苏义坤 范秀丽

森林工程2012,Vol.28Issue(3):69-73,5.
森林工程2012,Vol.28Issue(3):69-73,5.

基于DEA的建设项目集成管理信息系统运行效率评价

Evaluation on the Operational Efficiency of Integrated Management Information System for Construction Projects Based on DEA

苏义坤 1范秀丽2

作者信息

  • 1. 东北林业大学土木工程学院,哈尔滨150040
  • 2. 东北林业大学工程技术学院,哈尔滨150040
  • 折叠

摘要

Abstract

In order to evaluate the operating efficiency of integrated management information system for construction projects, the input indexes and output indexes of operating efficiency was constructed based on DEA principles and a DEA evaluation model was established. The evaluation indexes were quantified using expert scoring method and fuzzy mathematics method, and the model solution and result analysis method were provided. A case study was conducted to evaluate the operating efficiencies of integrated management information system for twelve large construction projects. The data was entered into the DEA evaluation model and was calculated by Matlab software package. The evaluation results provide a reference for the improvement of the integrated management information system of various large construction projects.

关键词

建设项目/集成管理信息系统/运行效率/数据包络分析

Key words

construction project/integrated management information system/operational efficiency/data envelopment analysis

分类

农业科技

引用本文复制引用

苏义坤,范秀丽..基于DEA的建设项目集成管理信息系统运行效率评价[J].森林工程,2012,28(3):69-73,5.

基金项目

科技部十二五科技支撑课题 ()

森林工程

OACSTPCD

1001-005X

访问量0
|
下载量0
段落导航相关论文