水利水电技术2012,Vol.43Issue(4):53-56,4.
南水北调大型埋地PCCP工程耐久性设计
Durability design of construction of large-scale embedded PCCP for Mid-Route of South-to North Water Transfer Project
王东黎 1徐志刚1
作者信息
- 1. 北京市水利规划设计研究院,北京100048
- 折叠
摘要
Abstract
The key points related to the durability design of the pre-stressed concrete cylinder pipe (PCCP) adopted in the Mid-Route of the South-to-North Water Transfer Project are discussed herein, I. E. ( 1) the design of the project layout; ( 2 ) the quality control of the pre-stressed steel wire; ( 3 ) the quality control of the concrete mortar; ( 4 ) the anticorrosion design; ( 5 ) the structural calculation and safety assessment; ( 6 ) the construction technology of the installation; etc.关键词
PCCP/耐久性设计/南水北调工程Key words
pre-stressed concrete cylinder pipe (PCCP) / durability design/ South-to-North Water Transfer Project分类
水利科学引用本文复制引用