三峡工程预埋件施工工艺

潘立鸥

水利水电技术2012,Vol.43Issue(4):61-63,3.
水利水电技术2012,Vol.43Issue(4):61-63,3.

三峡工程预埋件施工工艺

Construction technology of pre-embedded parts for Three Gorges Project

潘立鸥1

作者信息

  • 1. 中国水利水电第四工程局有限公司,河南新乡 453100
  • 折叠

摘要

Abstract

The construction technology of all kinds of the pre-embedded parts in concrete during the construction of the dam of the Three Gorges Project is described herein. The construction technology is specified along with adopting strict protection measures and strengthening inspection and supervision concerned during the construction, so as to ensure the quality of the dam concrete. Therefore, the construction quality is finally guaranteed.

关键词

预埋件/施工质量/施工工艺/三峡工程

Key words

pre-embedded parts/ construction quality/ construction technology/ Three Gorges Project