水利水电技术2012,Vol.43Issue(5):66-69,4.
架桥机在沙沱水电站的应用研究
Application of bridge erector to construction of Shatuo Hydropower Station
陈雄 1喻宝桢1
作者信息
- 1. 中国人民武装警察部队水电第一总队,广西南宁530028
- 折叠
摘要
Abstract
In accordance with the construction site layout of Shatuo Hydropower Station and the requirements from the metal structure installation on the overflow dam section, the bridge structural parts in-between the piers on the dam crest and their installed locations, an improved bridge erector with the type of WJQ40/160 is introduced into the installation. Through a reasonable construction layout, the erector not only optimizes the installation technology, but also lowers the difficulty of the installation, and then effectively, reliably, safely and conveniently accomplishes all the tasks of lifting and installation during the construction concerned; moreover, the relevant installation period is largely shortened as well.关键词
溢流坝段/金属结构安装/架桥机/吊装手段/沙沱水电站Key words
overflow dam section/metal structure installation/bride erector/technology of ifting and installation/Shatuo Hydropower Station分类
水利科学引用本文复制引用
陈雄,喻宝桢..架桥机在沙沱水电站的应用研究[J].水利水电技术,2012,43(5):66-69,4.