| 注册
首页|期刊导航|水资源保护|基于逆建模技术的淮河干流长台关-息县段入河污染负荷评估

基于逆建模技术的淮河干流长台关-息县段入河污染负荷评估

周金金 阮晓红

水资源保护2012,Vol.28Issue(3):28-31,37,5.
水资源保护2012,Vol.28Issue(3):28-31,37,5.DOI:10.3969/j.issn.1004-6933.2012.03.005

基于逆建模技术的淮河干流长台关-息县段入河污染负荷评估

Estimation of pollution load in Changtaiguan-to-Xixian section of main stream of Huaihe River based on inverse modeling technology

周金金 1阮晓红1

作者信息

  • 1. 南京大学地球科学与工程学院,江苏南京210093
  • 折叠

摘要

Abstract

A distributed source model was established according to the confluence characteristics of the Changtaiguan-to-Xixian section upstream of the Huaihe River, through a case study from 2008. The inverse modeling was conducted based on the Bayesian statistical method. "Hie measured data of the water quality at the studied section were used to calculate the pollution load flowing into the river and the degradation coefficients of the main water quality factors. The results show that the total pollution loads of NH3-N and COD in the study area were 17 000 t per year and 89 000 t per year, respectively. Affected by seasonal non-point source pollution loads, the pollution loads of NH3-N and COD were 657.55 t to 2014.99 t per month and 3 897.73 t to 13311.83 t per month, respectively. The degradation coefficients of NH3-N and COD were 0.356 per day and 0.202 per day, respectively. Trie correlation coefficients between simulated and measured values of NH3-N and COD were 0.943 and 0.979, respectively.

关键词

分布式源模型/逆建模技术/面源污染负荷/淮河干流

Key words

distributed source model/ inverse modeling technology/ non-point source pollution load/ main stream of Huaihe River

分类

资源环境

引用本文复制引用

周金金,阮晓红..基于逆建模技术的淮河干流长台关-息县段入河污染负荷评估[J].水资源保护,2012,28(3):28-31,37,5.

基金项目

国家水体污染控制与治理科技重大专项(2009ZX07210-010) (2009ZX07210-010)

水资源保护

OACSTPCD

1004-6933

访问量0
|
下载量0
段落导航相关论文