基于能量守恒的预制桩施工残余应力模拟OA北大核心CSCDCSTPCD
Simulation of post-installation residual stress in preformed piles based on energy conservation
预制桩施工阶段形成的残余应力较难由实测获得,其重要影响鲜受关注.从能量守恒原理出发,可模拟沉桩引起的桩身残余应力分布.计算模型采用剪切带理想弹塑性荷载传递关系及残余摩阻力折线型分布假定,以桩身弹性变形能为纽带,对预制桩沉贯和回弹过程进行能量分析,建立了施工全过程的能量平衡方程.参数分析显示,桩长径比与剪切带摩擦性状是影响桩身残余应力的关键因素.该模型能较合理预测某原型试桩的施工残余应力.
Installation of a preformed pile gives rise to residual stress locked in the pile. Such stress is difficult to be measured in-situ, hence little focus has been paid on its significant effect. Alternatively, a simulation approach is put forward in this study by incorporating the principle of energy conservation. The proposed model adopts assumptions that the load transfer behavior along the pile-soil interface is ideally elastoplastic and the distribution of …查看全部>>
刘俊伟;俞峰;张忠苗;王宁
浙江大学岩土工程研究所,杭州310058浙江理工大学建筑工程学院,杭州310018浙江大学岩土工程研究所,杭州310058浙江大学岩土工程研究所,杭州310058
建筑与水利
预制桩残余应力能量守恒模拟
preformed pile residual stress energy conservation simulation
《岩土力学》 2012 (4)
桩端后注浆残余应力及破坏机理研究
1227-1232,6
浙江省自然科学基金项目(No.Y1090610)国家自然科学基金项目(No.51078330).