中国电机工程学报2012,Vol.32Issue(13):I0005-I0005,1.
Integrated Power Generation Scheduling Compilation Method for Large-scale Small Hydropower Station Group
Integrated Power Generation Scheduling Compilation Method for Large-scale Small Hydropower Station Group
LI Shushan 1LIAO Shengli 1LI Gang 1CHENG Chuntian 1CAI Huaxiang 2LI Xiufeng2
作者信息
- 1. Dalian University of Technology
- 2. Yunnan Power Dispatching Center
- 折叠
摘要
Abstract
As a clean and renewable energy source, the small hydro plays a very important role in the power system. In China, the total installed capacity of small hydro has been over 55 GW by April 2010, accounting for about 30% of the total installed hydropower capacity. However, there is plenty of abandoned energy in most small hydro plants because of the disordered management and unscientific scheduling methods. Moreover, large amount of transmission overload has posed a great threat to the security and stability of the power grid with a great percentage of small hydro plants, especially in the wet season.关键词
水电站群/发电调度/可再生能源/编制/装机容量/小水电站/水电站管理/清洁能源Key words
small hydropower/generation scheduling/province-district integrated/tie-lines section check分类
建筑与水利引用本文复制引用
LI Shushan,LIAO Shengli,LI Gang,CHENG Chuntian,CAI Huaxiang,LI Xiufeng..Integrated Power Generation Scheduling Compilation Method for Large-scale Small Hydropower Station Group[J].中国电机工程学报,2012,32(13):I0005-I0005,1.