中国电力2012,Vol.45Issue(4):5-9,5.
宁东直流山东侧电网稳定控制措施研究
Research on power grid stabilitv control strategies for Ningdong DC line on Shandong side
赵强 1于洋 2许婧 1王琦 1王建明 1张文朝 1李轶群 3李新 4许渊 1侯玉强5
作者信息
- 1. 中国电力科学研究院,北京100192
- 2. 东北电网有限公司,辽宁沈阳110180
- 3. 华北电网有限公司,北京100053
- 4. 山东电力集团公司,山东济南250012
- 5. 国网电力科学研究院,江苏南京210003
- 折叠
摘要
Abstract
In order to study the influence of Ningdong DC bipolar fault on the synchronized security and stability of North-Central China power grid, the coupling between Ningdong ±660 kV DC project and UHV tie-line transmission power was analyzed based on the theoretical analysis of UHV AC pilot project steady stability limit. The influence of DC bipolar locking on the peak flow of UHV tie-line was investigated. According to the practical case study, load model of Shandong Grid was identified as an important factor in computation. The stability control measures and deployment scheme for Shandong grid after the operation of Ningdong DC project were proposed and tested by simulation. HVDC modulation is selected as the method to enhance stability in North-East Grid. The research result can be used as reference for future implementation of stability control system for interregional interconnection power system.关键词
宁东直流/山东电网/切负荷/稳定控制/直流调制Key words
Ningdong DC project/Shandong power grid/load shedding/stability control/DC modulation分类
信息技术与安全科学引用本文复制引用
赵强,于洋,许婧,王琦,王建明,张文朝,李轶群,李新,许渊,侯玉强..宁东直流山东侧电网稳定控制措施研究[J].中国电力,2012,45(4):5-9,5.