江西科学2012,Vol.30Issue(3):386-389,4.
潘桥水库大坝防渗加固设计与施工
Design and Construction of Seepage Control and Reinforcement of Panqiao Reservoir Dam
万月波1
作者信息
- 1. 丰城市紫云山灌区管理局,江西丰城331109
- 折叠
摘要
Abstract
This paper stated the design scheme choice of Panqiao reservoir dam anti-seepage and re- inforcement, main parameters of curtain grouting and concrete walls, construction procedure and method, construction quality control and inspection methods and engineering running effect.关键词
大坝防渗加固/混凝土防渗墙/帷幕灌浆/设计与施工Key words
Dam reinforcement/Concrete anti-seepage wall/Curtain grouting/Design/Construction分类
建筑与水利引用本文复制引用
万月波..潘桥水库大坝防渗加固设计与施工[J].江西科学,2012,30(3):386-389,4.