摘要
Abstract
Against the engineering characteristics of the deep foundation pit under sedimentary soft soil in Dianchi swamp and the surrounding environmental conditions and based on the comparision between various construction schemes, top-down method is adopted finally. Through the systematic analysis on the application of this method for such foundation pit in Dianchi lacustrine swamp, it is proved that it can solve the problems which can not be solved by common used pile-anchor supporting method and overcome many shortcomings of normal construction method, such as long construction period with inner support and large consumption of building materials on temporary support.关键词
逆作法/应用/沼泽沉积/滇池Key words
top-down method/application/swamp sediment/Dianchi分类
建筑与水利引用本文复制引用
吴香根,吴尚谦,吴柳宗,保佳慧..逆作法用于滇池沼泽沉积软土深基坑支护工程的研究分析[J].路基工程,2012,(3):158-162,167,6.