Abstract
In view of problems in multi-mode resource-constrained project scheduling,encoding method of a double-task list structure(problem task list and pattern list) as well as the decoding method of serial schedule's generating scheme were adopted to improve the traditional genetic algorithm.Global probability search was conducted based on operators of crossover,mutation and selection to determine the optimal scheme.Finally,this algorithm was tested based on benchmark problems in PSPLIB for its effectiveness.关键词
多模式/资源受限/项目调度/遗传算法/改进Key words
multi-mode/resource-constrained/project scheduling/genetic algorithm/improve分类