基于ANSYS的重力坝非溢流断面的优化设计

李芬花 郭丹

水利水电技术2012,Vol.43Issue(6):32-35,4.
水利水电技术2012,Vol.43Issue(6):32-35,4.

基于ANSYS的重力坝非溢流断面的优化设计

ANSYS based optimized design of non-overfdow section of gravity dam

李芬花 1郭丹1

作者信息

  • 1. 华北电力大学 可再生能源学院,北京102206
  • 折叠

摘要

Abstract

In accordance with the germetric properties of the basic section of gravity dam, a holistic simulation and element-subdivision are firstly made on gravity dam with a set of initial conditions predetermined by programming with ANSYS Parametric Design LanguagerAPDL) and then the mechanical properties of all the stager are obtained. Thereafter, the zero-order optimization method of the ANSYS is applied to the optimized design of the section of gravity dam, so as to make its cross-sectional area to be minimum under the premise to meet the constraint conditions of both the stress and the stability against sliding, and therefore, to realize the economics and feasibility of the design. Finally, a satisfied result is obtained through a case of gravity dam design.

关键词

重力坝/ANSYS/优化设计

Key words

gravity dam/ ANSYS/ optimized design

分类

建筑与水利

引用本文复制引用

李芬花,郭丹..基于ANSYS的重力坝非溢流断面的优化设计[J].水利水电技术,2012,43(6):32-35,4.

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文