| 注册
首页|期刊导航|水利水电技术|全断面掘进机(TBM)施工中豆砾石回填灌浆技术

全断面掘进机(TBM)施工中豆砾石回填灌浆技术

刘丽萍

水利水电技术2012,Vol.43Issue(6):63-66,4.
水利水电技术2012,Vol.43Issue(6):63-66,4.

全断面掘进机(TBM)施工中豆砾石回填灌浆技术

Pea-gravel backfill grouting technology during TBM construction

刘丽萍1

作者信息

  • 1. 山西省万家寨引黄工程管理局,山西太原030012
  • 折叠

摘要

Abstract

In accordance with the problems from the pea-gravel backfill grouting during TBM construction, a construction technology of section construction with inflation hose is put forward in combination with the conventional technologies concerned Hie technical details and specific measures of the technology are described herein. The practice demonstrates that the technology has the merits of convenient for construction, better effect of backfill grouting and lower construction cost and has been applied to the actual project, and then can ensure the safety operation of the long-distance water conveyance tunnel project

关键词

全断面掘进机/豆砾石/回填灌浆/分段施工/万家寨引黄工程

Key words

TBM/ pea-gravel/ backfill grouting/ section construction/ Wanjiazhai Yellow River Diversion Project

分类

交通工程

引用本文复制引用

刘丽萍..全断面掘进机(TBM)施工中豆砾石回填灌浆技术[J].水利水电技术,2012,43(6):63-66,4.

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文