摘要

Abstract

In view of the risk analysis' s dependance on expert' s judgment on unascertained information, a new method named unascertained-analytic network process was proposed combining unascertained measure comprehensive evaluation model with analytic network process. The basic theory was introduced in particular and the method was then applied to an earth-rock dam' s risk analysis. The result is consistent with that analyzed with fuzzy analytic hierarchy process, which indicates that the proposed method is feasible and reasonable.

关键词

风险分析/未确知测度/网络分析法/土石坝

Key words

risk analysis/unascertained measure/analytic network process/earth-rock dam

分类

建筑与水利

引用本文复制引用

李宗坤,叶青,李锋..基于未确知网络分析法的土石坝风险分析研究[J].郑州大学学报(工学版),2012,33(1):11-15,5.

基金项目

河南省重大公益性科研计划资助项目(08110091200) (08110091200)

郑州大学学报(工学版)

OA北大核心CSTPCD

1671-6833

访问量0
|
下载量0
段落导航相关论文