摘要
Abstract
In this article, we has analyzed the blocking problems produced during the operation of theflue gas heat exchanger (GGH). Through the ad- justment and optimization of the operating parameters on on-line cleaning device,we effectively solve the jam problems of# 1 #2 GGH Heat transfer elements in Sanhe Power Plant, so that the safety and economy of desulfurization system is greatly improved,which has certain direct sense in a thermal power plant WFGD GGH congestion management.关键词
烟气换热器(GGH)/换热元件堵塞原因/治理Key words
GGH/heat exchange element blocking reasons/treatment分类
资源环境引用本文复制引用
魏书洲,温武斌,张国新,蔡向东,田长河..三河电厂GGH堵塞分析及治理[J].长春工程学院学报:自然科学版,2012,13(2):49-51,58,4.