| 注册
首页|期刊导航|长春工程学院学报:自然科学版|电阻率联合剖面法在岩土工程勘察中的应用

电阻率联合剖面法在岩土工程勘察中的应用

吴礼群

长春工程学院学报:自然科学版2012,Vol.13Issue(2):70-72,3.
长春工程学院学报:自然科学版2012,Vol.13Issue(2):70-72,3.

电阻率联合剖面法在岩土工程勘察中的应用

The application of resistivity combined profiles method in geotechnical engineering investigation

吴礼群1

作者信息

  • 1. 四川省冶金地质勘查局606大队,成都611730
  • 折叠

摘要

Abstract

The application of resistivity combined profiles method to investigate the fault structure in project workspace of second phase of the Luhu in Chengdu City. The results show that the method has some advantages such as the time short of field operations, the big capacity data gathered and the obvious anomalous in geotechnical engineering investigation,so it is one of the effective methods in geotechnical engineering investigation.

关键词

电阻率/联合剖面法/工程勘察/成都麓湖二期

Key words

resistivity/combined profiles method/geotechnical engineering investigation/second phase of Luhu in Chengdu City

分类

地球科学

引用本文复制引用

吴礼群..电阻率联合剖面法在岩土工程勘察中的应用[J].长春工程学院学报:自然科学版,2012,13(2):70-72,3.

长春工程学院学报:自然科学版

1009-8984

访问量0
|
下载量0
段落导航相关论文