| 注册
首页|期刊导航|工业工程|应用作业成本法的模糊EPQ模型

应用作业成本法的模糊EPQ模型

贺丽 曾玲

工业工程2012,Vol.15Issue(2):78-83,120,7.
工业工程2012,Vol.15Issue(2):78-83,120,7.

应用作业成本法的模糊EPQ模型

Fuzzy EPQ Model by Using Activity-Based Costing Method

贺丽 1曾玲1

作者信息

  • 1. 桂林电子科技大学数学与计算科学学院,广西桂林541004
  • 折叠

摘要

Abstract

In the existing economic production quantity ( EPQ) models, there are unrealistic assumptions such that it is not applicable in practice. To overcome this drawback, the problem of EPQ is studied by using the activity-based costing method. In considering repairable imperfect items under the storage capacity limitation, an inventory cost control model is developed with fuzzy parameters. Then, the optimal production quantity and shortage quantity are found. An example is given to illustrate the feasibility and effectiveness of the proposed method.

关键词

作业成本法/模糊参数/EPQ模型

Key words

activity-based costing/ fuzzy parameters/ economic production quantity (EPQ) model

分类

数理科学

引用本文复制引用

贺丽,曾玲..应用作业成本法的模糊EPQ模型[J].工业工程,2012,15(2):78-83,120,7.

基金项目

广西研究生教育创新计划资助项目(2010105950701M29) (2010105950701M29)

工业工程

OA北大核心CHSSCDCSTPCD

1007-7375

访问量0
|
下载量0
段落导航相关论文