华东交通大学学报2012,Vol.29Issue(3):11-15,5.
基于Vague集贴近度的工程项目投资快速估算方法
Fast Estimation Method for Project Investment Based on Vague Sets Proximity
易欣1
作者信息
- 1. 华东交通大学土木建筑学院,江西南昌330013
- 折叠
摘要
Abstract
According to Vague sets and its proximity calculation, this paper establishes a new fast estimating model of the construction cost. Firstly, the existing similar projects have been selected from the historical data. Secondly, the main characteristic factors which may influence project cost are selected to establish the corre sponding characteristic value matrix. Based on interval integrated unit price, the Vague sets matrix of existing project is founded. Similarity degree of all the existing and designed projects is calculated. Through the cost in dex and maximal similarity project, the designed project cost has been estimated. Finally, the validity and accu racy of this model have been proved by practical data.关键词
工程项目/快速估价/Vague集/贴近度计算/特征因素Key words
construction project/fast estimate/ Vague sets/proximity calculation/characteristic factors分类
建筑与水利引用本文复制引用
易欣..基于Vague集贴近度的工程项目投资快速估算方法[J].华东交通大学学报,2012,29(3):11-15,5.