华东交通大学学报2012,Vol.29Issue(3):67-73,7.
基于AHP-模糊综合法的浅埋隧道施工风险评估
Risk Assessment of Shallow Buried Tunnel Based on AHP and Fuzzy Synthesis Method
李得昌 1杨新安 1王树杰1
作者信息
- 1. 同济大学城市轨道与铁道工程系,上海200092
- 折叠
摘要
Abstract
The construction risks occur easily in shallow buried tunnel, such as side collapse, tunnel roof fall, hill aspect cracks, deformation instability which are caused by geological, terrain and influence of the environ ment. The security,duration and environmental risk of Ning-An inter-city railway shallow tunnels are analyzed. Then, the risk assessment principles and steps of the improved fuzzy synthesis method based on AHP are intro duced. An analytic hierarchy model of shallow tunnel construction and the possibility judgment matrix depend ing on improved fuzzy number are established. Finally, the Zhongming No.1 Tunnel risk grade is determined through risk coefficient and the typical risk reduction measures are put forward, combining with tunnel charac teristics and risk assessment results.关键词
浅埋隧道/层次分析/模糊综合法/风险评估Key words
shallow tunnel/ analytic hierarchy process/ fuzzy comprehensive method/ risk assessment分类
交通工程引用本文复制引用
李得昌,杨新安,王树杰..基于AHP-模糊综合法的浅埋隧道施工风险评估[J].华东交通大学学报,2012,29(3):67-73,7.