| 注册
首页|期刊导航|黑龙江科技学院学报|高水材料在桃山煤矿井下充填实验

高水材料在桃山煤矿井下充填实验

李凤义 李谭 王维维

黑龙江科技学院学报2012,Vol.22Issue(3):221-224,4.
黑龙江科技学院学报2012,Vol.22Issue(3):221-224,4.

高水材料在桃山煤矿井下充填实验

Filling experiment of high-water material in Taoshan coal mine

李凤义 1李谭 2王维维1

作者信息

  • 1. 黑龙江科技学院安全工程学院,哈尔滨150027 黑龙江科技学院黑龙江矿业研究院,哈尔滨150027
  • 2. 黑龙江科技学院黑龙江矿业研究院,哈尔滨150027
  • 折叠

摘要

Abstract

Aimed at effectively controlling the roof of goaf, this paper describes a field test of the partial filling of goal, based on controlling mechanism of goal filling, at the right fourth part of the third mine, ninth panel of Taoshan coal mine in Qitaihe by using the high water materials. The test consists of the reasonable selection and arrangement of filling pipes, and the mechanism analysis of the mechanics, structure and pressure of the filling. The result show that the filling, capable of actively binding roof, contributes to preventing the deformation of the old roof effectively and increasing the recovery ratio of coal. All the indexes of field test, up to the underground filling requirements, can offer reference for the filling of goal in other coal mines with similar geological conditions.

关键词

高水材料/部分充填/主动接顶

Key words

high-water material/partial filling/top directly

分类

矿业与冶金

引用本文复制引用

李凤义,李谭,王维维..高水材料在桃山煤矿井下充填实验[J].黑龙江科技学院学报,2012,22(3):221-224,4.

黑龙江科技学院学报

OACSTPCD

2095-7262

访问量0
|
下载量0
段落导航相关论文