近距离煤层群上行开采薄煤层覆岩移动规律研究

许力峰 刘珂铭 张江利 周根立 李艳君 杨维帅

煤矿安全2012,Vol.43Issue(7):52-55,4.
煤矿安全2012,Vol.43Issue(7):52-55,4.

近距离煤层群上行开采薄煤层覆岩移动规律研究

Study on Overlying Rocks Movement Laws of Ascending Mining Thin Coal Seam in Closed Distance Coal Seam Group

许力峰 1刘珂铭 1张江利 1周根立 1李艳君 1杨维帅1

作者信息

  • 1. 中国矿业大学(北京)资源与安全工程学院,北京100083
  • 折叠

摘要

Abstract

In order to upward mine abandoned coal resources securely and effectively, according to the coal seam occurrence condition and present mining situation of Zhangjiazhuang coal mine in Fenxi , failure and movement laws of overlying rocks were studied by theo- retical analysis and UDEC discrete element numerical software simulation when 10# coal seam and 9# thin coal seam were mined respectively. Overlying rocks'movement and deformation laws of two kinds of typical lithologic structures mudstone and limestone were con- trasted and analyzed. By monitoring overlying rocks displacement changes as excavation goes when coal seams were mined, the paper draws a conclusion that the mining stable time of mudstone lithologic structure overlying rock is shorter than the time of limestone lithol- ogic structure overlying rock, which is consistent with the real situation.

关键词

煤层群/上行开采/薄煤层/UDEC数值模拟/岩性结构/开采时间

Key words

coal seam group/ascending mining/thin coal seam/UDEC numerical simulation/lithologic structure/mining time

分类

矿业与冶金

引用本文复制引用

许力峰,刘珂铭,张江利,周根立,李艳君,杨维帅..近距离煤层群上行开采薄煤层覆岩移动规律研究[J].煤矿安全,2012,43(7):52-55,4.