水利学报2012,Vol.43Issue(7):757-766,10.
跨流域供水水库群联合调度规则研究
Multi-reservoir operating rule in inter-basin water transfer-supply project
摘要
Abstract
In view of the Stackelberg structure of the multi-reservoir joint operation problem in inter-basin water transfer-supply project, this paper proposes a multi-reservoir joint operation policy, which consists of water transfer rule and water supply rule. In this study, a set of water transfer rule curves based on the storage of individual reservoir in the system is employed to illustrate the water transfer rule, which deter- mines the starting conditions of water transfer and the allocation of the transferred water. The water supply rule is presented using an operation chart, the hedging rule curves of which for each water user divide the reservoir active storage into several operation zones. Besides, this paper proposes a bi-level programming (BLP) model for the Stackelberg structure of the inter-basin muhi-reservoir joint operation problem, which includes the upper-level model for water transfer and the lower-level model for water supply. The improved particle swarm optimization algorithm is employed to solve the BLP model. An inter-basin water transfer project in North China is taken as the case study to verify the reasonability and validity of the model.关键词
跨流域调水/水库群/调/供水规则/二层规划/改进粒子群Key words
inter-basin water transfer/muhi-reservoir/water-transfer and water-supply rule/the BLP model/improved PSO分类
建筑与水利引用本文复制引用
郭旭宁,胡铁松,吕一兵,张涛..跨流域供水水库群联合调度规则研究[J].水利学报,2012,43(7):757-766,10.基金项目
基金项目:国家自然科学基金项目 ()
武汉大学2008年博士研究生(含1+4)自主科研项目 ()
教育部博士点基金项目 ()
武汉大学博士研究生短期出国(境)研修专项经费 ()