水电站垫层蜗壳结构研究和应用的现状和发展
Advance in research and application of spiral case structure with a membrane in hydroelectric power plant
摘要
Abstract
The development in the research and application of spiral case structure with a membrane(SC- SM) in hydroelectric power plant, is summarized. It is indicated that SCSM is the trend in development of selecting the embedding type for spiral case. Two significant advances are pointed out: the joint stressing of spiral case and surrounding concrete, the sliding friction between them. The nonlinear mechanical behav- ior of membrane material as a factor influencing significantly the SCSM research should be considered in the future. The influences of membrane's material and space property on the structural performances of SC- SM are respectively stated, and on that basis the existing problems of the SCSM research are concluded. Fi- nally, it is suggested that the of concepte control should be the focus of research in SCSM and the mem- brane could be regarded as a controlling measure. To explore the theory and measure for controlling the structural performances of spiral case structure from the viewpoint of effect of membrance should be the im- portant topics of research in this field.关键词
水工结构/研究进展/综述/蜗壳/垫层Key words
hydraulic structure/research advance/overview/spiral case/membrane分类
建筑与水利引用本文复制引用
张启灵,伍鹤皋..水电站垫层蜗壳结构研究和应用的现状和发展[J].水利学报,2012,43(7):869-876,8.基金项目
基金项目:国家自然科学基金资助项目 ()
中央级公益性科研院所基本科研业务费 ()