摘要

Abstract

This paper, with reference to the design drawings of 18# non-crossing crossover catenary, offers detailed explanations of the method to determine "third zone" of 18# non-crossing turnout catenary, the change pattern of catenary height of the side line corresponding to trunk line catenary, the working mechanism of the pantograph passing through the crossover, and the procedures to adjust the entire crossover.

关键词

哈大客运专线/18号无交叉线岔/调整/施工步序

Key words

Harbin - Dalian Passenger Dedicated Line/ 18 # non-crossing crossover/ Adjust/ Construction procedure