摘要

Abstract

The site of Bulunkou -Konggur hydropower station is located in high altitude area. The construction of buried surge shaft with long - narrow upper chamber is very difficult and exists many unsafe factors. Throughout technology study and innovation, the construction method of pilot shaft expanding excavation by stages is successfully used. The excavation construction of surge shaft is implemented smoothly while its security, quality, schedule and economical are satisfied.

关键词

高海拔区/埋藏式/调压井/开挖施工

Key words

high altitude area/ buried/ surge shaft/ excavation construction

分类

建筑与水利

引用本文复制引用

周峰,白现军,刘章,陈功民,侍克斌..带狭长型上室的埋藏式调压井开挖施工技术研究[J].水资源与水工程学报,2012,23(3):41-43,47,4.

基金项目

国家高等学校博士点专项科研基金资助课题(200807580007) (200807580007)

新疆水利水电工程重点学科基金资助项目(xjzdxk-2010-10-06) (xjzdxk-2010-10-06)

水资源与水工程学报

OACSTPCD

1672-643X

访问量0
|
下载量0
段落导航相关论文