软岩巷道锚注支护时机优化研究

陆银龙 王连国 张蓓 李玉杰

岩土力学2012,Vol.33Issue(5):1395-1401,7.
岩土力学2012,Vol.33Issue(5):1395-1401,7.

软岩巷道锚注支护时机优化研究

Optimization of bolt-grouting time for soft rock roadway

陆银龙 1王连国 1张蓓 2李玉杰1

作者信息

  • 1. 中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州221008
  • 2. 中国矿业大学矿业工程学院,江苏徐州221008
  • 折叠

摘要

Abstract

Bolt-grouting technology is an effective way to maintain the stability of soft rock roadway, and its effects rely heavily on the grouting time. The mechanical characteristics of ruptured soft rock reinforced by grouting are analyzed, and the rational grouting time for soft rock roadway is optimized by numerical simulation using the strain softening constitutive law in FLAC2D. The results show that as the grouting time lags, the infiltration scope of the grout in rock increases gradually but the strength of rock reinforced by grouting decreases dramatically, and the deformation of roadway decreases first and then increases. On the basis of this, a method integrating numerical simulation and monitoring for determining the rational bolt-grouting time is proposed and better results have been achieved in engineering practice. This method provides a favorable guidance for the construction and design of bolt-grouting support in soft rock roadway.

关键词

软岩巷道/锚注支护/应变软化/支护时机/优化

Key words

soft rock roadway/ bolt-grouting support/ strain softening/ support time/ optimization

分类

矿业与冶金

引用本文复制引用

陆银龙,王连国,张蓓,李玉杰..软岩巷道锚注支护时机优化研究[J].岩土力学,2012,33(5):1395-1401,7.

基金项目

国家重点基础研究发展计划(973计划)资助项目(No.2010CB226805) (973计划)

国家自然科学基金项目(No.50874103) (No.50874103)

江苏省自然科学基金项目(No.BK2008135). (No.BK2008135)

岩土力学

OA北大核心CSCDCSTPCD

1000-7598

访问量0
|
下载量0
段落导航相关论文