长江科学院院报2012,Vol.29Issue(8):83-88,6.DOI:10.3969/j.issn.1001-5485.2012.08.016
乌东德水电站右岸拱肩槽边坡稳定性研究
Slope Stability at the Right Abutment of Wudongde Hydropower Station
摘要
Abstract
Based on detailed investigation on the engineering geological conditions of the natural slope at the right a-butment of Wudongde hydropower station on Jinsha River, the global stability of artificial slope was analyzed systematically by means of macro-analysis and numerical calculation. Potential instability model of artificial slope block was given via structural plane analysis. Starting with the influencing factors of block stability, an evaluation standard was established, based on which the block stability was evaluated. Engineering geological analysis showed that the global stability of artificial slope was good. Three-dimensional discrete element simulation results showed that the artificial slope displayed inconspicuous deformation characteristics. Most of the potential blocks of artificial slope were generally stable. According to global and local stability analysis, reinforcement measures were put forward for the slopes. The research provides a basis for the design and construction and for similar projects.关键词
工程地质评价/三维离散元/块体/失稳模式分析/稳定性评价标准Key words
engineering geology evaluation/3-D discrete element/ block/ instability mode analysis/ stability evaluation standard分类
建筑与水利引用本文复制引用
李会中,王吉亮,黄孝泉,杨静,刘冲平,白伟,冯龙..乌东德水电站右岸拱肩槽边坡稳定性研究[J].长江科学院院报,2012,29(8):83-88,6.基金项目
国家“973”计划项目(2011CB013500) (2011CB013500)
水利部公益性行业科研专项项目(201001008) (201001008)
国家大坝安全工程技术研究中心研发课题(2011NDS010) (2011NDS010)