| 注册
首页|期刊导航|电力系统自动化|考虑新能源发电不确定性的可用输电能力风险效益评估

考虑新能源发电不确定性的可用输电能力风险效益评估

王俊 蔡兴国 季峰 李现忠

电力系统自动化2012,Vol.36Issue(14):108-112,5.
电力系统自动化2012,Vol.36Issue(14):108-112,5.

考虑新能源发电不确定性的可用输电能力风险效益评估

Evaluation of Risk and Benefit of ATC Relating to Uncertainty of Renewable Energy Power Generation

王俊 1蔡兴国 2季峰 2李现忠3

作者信息

  • 1. 哈尔滨工业大学电气工程及自动化学院,黑龙江省哈尔滨市150001 沈阳农业大学信息与电气工程学院,辽宁省沈阳市110866
  • 2. 哈尔滨工业大学电气工程及自动化学院,黑龙江省哈尔滨市150001
  • 3. 烟台供电公司,山东省烟台市264001
  • 折叠

摘要

Abstract

With the rapid development of renewable energy power generation, its intermittence and stochastic of output power have significant influence on available transfer capability (ATC). The characteristics of the renewable energy power generation, e.g. the intermittence, stochastic, load fluctuation, and status uncertainty, are simulated through Monte Carlo simulation method. The ATC under specific status and parameters of system are solved through optimal power flow. The probability density of ATC samples is defined by applying probability statistics theory to establish a risk benefit model, and to achieve ATC with maximum comprehensive benefits. To analyze the influence of renewable energy power generation on ATC, with respect to position of power generation equipment, uncertainty of power output and penetration level etc. The method is validated by simulation on a modified IEEE 118 system involving wind power and solar power.

关键词

可用输电能力/新能源发电/不确定性/蒙特卡洛仿真/风险/效益

Key words

available transfer capability (ATC)/renewable energy power generation/uncertainty/Monte Carlo simulation/risk/benefit

分类

交通工程

引用本文复制引用

王俊,蔡兴国,季峰,李现忠..考虑新能源发电不确定性的可用输电能力风险效益评估[J].电力系统自动化,2012,36(14):108-112,5.

基金项目

高等学校博士学科点专项科研基金资助项目 ()

黑龙江省科技攻关项目 ()

沈阳农业大学教师科研基金项目(20101019)~~ ()

电力系统自动化

OA北大核心CSCDCSTPCD

1000-1026

访问量0
|
下载量0
段落导航相关论文