| 注册
首页|期刊导航|电力系统自动化|考虑大规模风电调峰要求的系统机组检修计划

考虑大规模风电调峰要求的系统机组检修计划

张宏宇 印永华 申洪 何剑 赵珊珊

电力系统自动化2012,Vol.36Issue(16):25-30,6.
电力系统自动化2012,Vol.36Issue(16):25-30,6.

考虑大规模风电调峰要求的系统机组检修计划

Generator Maintenance Scheduling of Large-scale Wind Power Integration Considering Peak Shaving

张宏宇 1印永华 1申洪 1何剑 1赵珊珊1

作者信息

  • 1. 中国电力科学研究院,北京市100192
  • 折叠

摘要

Abstract

It is important to consider the operational characteristics of wind power in the generator maintenance scheduling for optimizing the use of wind power and ensuring the safety of system operation. A comprehensive model of generator maintenance scheduling, considering the operational characteristics of wind power, the fluctuation characteristics of load and the regulating and maintenance characteristics of units, is established. The model optimization goal is the combination of system maintenance cost and revenue loss of wind energy, which is mainly constrained by the power generation reliability and peak-load regulating adequacy. Based on Benders decomposition, the model is decomposed into two parts: a master problem (deterministic multi-objective integer programming) and three sub-problems (revenue loss of wind energy calculation, power generation reliability and peak-load regulating adequacy) for decentralized coordination, and this method is applied to make maintenance scheduling for all the generators in IEEE-RTS test system with large-scale wind power integration. The results prove that the proposed method is feasible and effective.

关键词

风力发电/机组检修/发电可靠性/调峰充裕性/Benders分解法/半不变量/随机生产模拟

Key words

wind power generation/unit maintenance/generation reliability/peak-load regulating adequacy/Benders decomposition/cumulant/probabilistic production simulation

分类

信息技术与安全科学

引用本文复制引用

张宏宇,印永华,申洪,何剑,赵珊珊..考虑大规模风电调峰要求的系统机组检修计划[J].电力系统自动化,2012,36(16):25-30,6.

电力系统自动化

OA北大核心CSCDCSTPCD

1000-1026

访问量0
|
下载量0
段落导航相关论文