抛石爆破挤淤过程的有限元数值模拟
Finite Element Simulation to the Process of Explosion Replacement
摘要
Abstract
The main process of explosion replacement can be divided into four steps. The first step is squeezing soft clay with stone. The second step is conducting explosion in the soft clay, reducing the strength of the soft clay, breaking the balance between the stone and the soft clay, then the stone sliding into the soft clay until the new balance is created. The third step is continuing conducting explosion after adding more stones and repeating the process. The fourth step is conducting side explosion after 50 m-long dike have been constructed. The finite element simulations to the four processes of explosion replacement were conducted respectively through changing the strength of the soft clay instead of the effect of explosion, then the treatment effect can be predicted. The simulations were verified by the actual boring inspecting and ground penetrating radar inspecting results in an engineering application. The simulating results indicate that the sea dike constructed by explosion replacement will be shaped like a horseshoe after the four steps treatment.关键词
淤泥/抛石挤淤/爆破挤淤/有限元数值模拟Key words
soft clay/ squeezing soft clay with stone/ explosion replacement/ finite element simulation分类
建筑与水利引用本文复制引用
陈鸿,欧阳宇峰,余海忠..抛石爆破挤淤过程的有限元数值模拟[J].地质科技通报,2012,31(4):98-105,8.基金项目
深圳市建筑工务署基金项目(SZCG2006033849) (SZCG2006033849)