| 注册
首页|期刊导航|工业工程|基于马尔可夫链模型的B&L VP (X)控制图统计性能分析

基于马尔可夫链模型的B&L VP (X)控制图统计性能分析

郭志芳 程龙生

工业工程2012,Vol.15Issue(3):87-91,5.
工业工程2012,Vol.15Issue(3):87-91,5.DOI:10.3969/j.issn.1007-7375.2012.03.017

基于马尔可夫链模型的B&L VP (X)控制图统计性能分析

Statistical Performance Analysis of a VP (X) Control Chart with B&L Switching Rule by Using a Markov Chain Model

郭志芳 1程龙生1

作者信息

  • 1. 南京理工大学经济管理学院,江苏南京210094
  • 折叠

摘要

Abstract

In statistical process control, variable parameter (VP)X chart is widely used. To improve the performance of the VP X chart, Bai & Lee ( B&L) switching rules are applied to design the VP X chart. By this method, a Markov chain model is developed to obtain the expressions of Average Time to Signal ( ATS), Adjusted Average Time to Signal ( AATS) , and average number of switches ( ANSW). To evaluate the performance of the proposed method, comparison is done between the chart designed by the proposed method and the existing VP X chart by using two samples. Results show that, with the same average run-time, the proposed method outperforms the existing VP X chart in both shortening the alarm time and in reducing the number of switch times. The larger the parameter L is, the better the performance of the proposed method is.

关键词

统计过程控制/控制图/变量参数(X)控制图/马尔可夫链

Key words

statistical process control/ control chart/ variable parameter X chart/ Markov chain

分类

管理科学

引用本文复制引用

郭志芳,程龙生..基于马尔可夫链模型的B&L VP (X)控制图统计性能分析[J].工业工程,2012,15(3):87-91,5.

基金项目

教育部人文社会科学研究规划基金资助项目(10YJA630020) (10YJA630020)

国家自然科学基金资助项目(11071120) (11071120)

江苏省社会科学基金资助项目(08SHA001) (08SHA001)

工业工程

OA北大核心CHSSCDCSTPCD

1007-7375

访问量0
|
下载量0
段落导航相关论文